OECP publishes the outline of every written exam in its candidate manual. This guide lays those outlines out by domain, lists the references OECP checks its questions against, and gives you a plan that follows the weights.

The short answer

The OECP mobile crane written is about 58% operations, 27% load charts and 15% standards. You have 75 questions and two hours, about 96 seconds a question, with no calculator. OECP does not sell a study guide or run classes. It sends candidates to the candidate manual and to their local's training site.

Checked November 2026 against the OECP Crane Operator Candidate Manual (2025 edition) and the OECP FAQ.

Start with what OECP gives you

The OECP Crane Operator Candidate Manual is free on oecp.org, and it is the closest thing to an official OECP study guide. The 2025 edition includes:

  • The outline of each written exam, by domain and sub-domain
  • 45 sample questions with answers, 15 each for the mobile, overhead and tower exams
  • Two sample load charts used by those questions, one for a Manitowoc 222 and one for a Peiner SK 405 tower crane
  • The list of standards and books used to verify the exam questions
  • The practical exam tasks and how they are scored

The manual is plain about the rest: OECP does not supply study or resource materials and does not conduct training for the exams. It tells candidates to go to their IUOE local's training site for classes and refreshers.

OECP mobile crane written exam

One exam covers boom truck, lattice boom and telescopic boom cranes. 75 questions, two hours.

Mobile crane written exam domains
DomainShareWhat it covers
A. Standards knowledgeAbout 15%Power line clearances, wire rope retirement, use of rigging, limit switches, tag lines, personnel platforms and trainee operation
B. Operations knowledgeAbout 58%Before the lift: log books, checks, locating utilities, blocking, setup and leveling. During it: the operator's manual, controls, hoisting and swinging, hand signals, emergencies, lockout and tagout, load calculations, overloads and operator aids. After it: securing and dismantling
C. Load charts knowledgeAbout 27%Choosing the right chart, deductions, gross and net capacity, range and work area diagrams, chart footnotes, parts of line and how the LMI relates to the chart

Source: OECP Crane Operator Candidate Manual, written examination outline for mobile cranes.

Free OECP practice test

25 questions, no sign-up, every answer explained.

Start now

OECP tower crane written exam

75 questions, two hours. Nearly half the exam is about what you do before the first lift.

Tower crane written exam domains
DomainShareWhat it covers
Pre-operationsAbout 46%Visual inspection of the ground, structure, electrical and mechanical systems, wire rope, rigging, hooks and tie-ins. Documents and placards. Functional checks of controls, limits, communications and operator aids
OperationsAbout 44%Hoisting and positioning loads, regulations, hoisting personnel, weather, fall protection, emergencies, lockout and tagout, shutdown and pre-lift planning
TechnicalAbout 10%Erection, climbing and dismantling. Structural components. Electrical, hydraulic and mechanical systems

Source: OECP Crane Operator Candidate Manual, written examination outline for tower cranes.

OECP overhead crane written exam

75 questions, two hours. More than half is operations.

Overhead crane written exam domains
DomainShareWhat it covers
A. StandardsAbout 15%Wire rope, rigging hardware, limit switches, trainee operation and federal, state and local regulations
B. Pre-operationsAbout 32%Visual inspection of the work area, structure, mechanics, wire rope, rigging, hooks and sheaves. Functional checks of controls, limit switches, communications and operator aids. Pre-lift procedures
C. OperationsAbout 53%Operating procedures, load calculations, hook positioning, smooth movement, interlocks and warning devices, hoisting over personnel, tag lines, hand signals, lockout and tagout, working close to other cranes, tandem lifts and shutdown

Source: OECP Crane Operator Candidate Manual, written examination outline for overhead cranes.

The references OECP checks its questions against

The manual lists the sources used to verify exam questions. If you want the original text behind a practice question, it is in one of these.

  • ASME B30.5, Mobile and Locomotive Cranes
  • ASME B30.3, Tower Cranes
  • ASME B30.2, Overhead and Gantry Cranes
  • ASME B30.4, Portal and Pedestal Cranes, and ASME B30.23, Personnel Lifting Systems
  • OSHA 29 CFR 1926.1400 to 1926.1442, the construction crane rule, and 1926.251, rigging equipment
  • OSHA 29 CFR 1910.179, 1910.180 and 1910.147, covering overhead cranes, crawler and truck cranes and lockout and tagout
  • IPT's Crane and Rigging Training Manual
  • Mobile Cranes and Rigging, both from the Crane Institute of America
  • Mobile Craning Today, from the Operating Engineers Training Institute of Ontario

Your local's training site is the place to find these on a shelf. You do not have to buy the set to pass.

A study plan that follows the weights

  1. Read the outline for your examPrint the domain list from the candidate manual and mark every line you could not explain to an apprentice. That is your study list.
  2. Take a practice test coldDo it before you study anything. The free 25-question test shows which domain is costing you points.
  3. Study in order of weightOn the mobile exam, operations is more than half the questions. Fix operations first, then load charts, then standards.
  4. Do the load chart math by handNo calculator is allowed, so practice with a pencil. Write out gross capacity, each deduction and net capacity until you stop making arithmetic slips. Load calculation practice.
  5. Work the sample questions in the manualThey come with two sample load charts. Use them the way you will use the charts handed to you in the exam.
  6. Run a timed set75 questions in two hours is about 96 seconds each. Recertification is 50 questions in an hour and a half. Practice at that pace so the clock is not a surprise.
  7. Know your hand signalsHand signals are on the written outline and they are the first test of the practical.

Six sample questions, two from each domain

Two questions on standards, two on operations and two on load charts, in the order the mobile crane outline lists them. These are original practice questions, not actual OECP exam questions.

  1. OSHA 1926 Subpart CC

    1. According to OSHA 1926.1402, the controlling entity must inform the user and operator of hazards beneath the equipment set-up area such as:

    Show answer

    Answer: C. Voids, tanks, and utilities identified in documents in its possession or otherwise known to it. 1926.1402(c)(2) requires the controlling entity to disclose hazards beneath the set-up area (such as voids, tanks, utilities) identified in site drawings, as-built drawings, and soil analyses or otherwise known to it.

  2. ASME B30.5 (Mobile Cranes)

    2. Under ASME B30.5, what is a "periodic inspection" of a mobile crane?

    Show answer

    Answer: B. A detailed documented inspection performed at 1- to 12-month intervals depending on service and environment. B30.5 periodic inspections are complete, documented inspections at intervals from 1 to 12 months based on activity, severity of service, and environment.

  3. Operations

    3. Before a multi-crane lift begins, the lift director must review the plan…

    Show answer

    Answer: C. In a meeting with all workers who will be involved in the operation. The lift director is required to review the multi-crane plan in a meeting with every worker involved in the operation.

  4. Mobile Crane Essentials

    4. To achieve the full rated capacity of a crane on outriggers, what setup is required?

    Show answer

    Answer: B. Outriggers fully extended and tires clear of the ground. Full capacity requires outriggers fully extended AND the tires clear of the ground.

  5. General Knowledge

    5. In most cases when a measured load radius falls between values listed in the load chart:

    Show answer

    Answer: B. use the gross capacity for the next longer radius listed in the chart. When the radius falls between chart values, you must use the capacity for the next longer radius, which gives the lower, safer value.

  6. Load Charts

    6. A load weighs 36,500 lbs and your line pull is 9,000 lbs. Minimum parts of line?

    Show answer

    Answer: C. 5. 36,500 ÷ 9,000 = 4.06 — you can't rig 4.06 parts, so you need 5.

Where OECP training comes from

OECP tests. It does not train. Its FAQ says experience is the best preparation and points candidates to their local union training site for more resources and classes.

So OECP training means your local's training center: crane classes, refresher courses before a written exam and seat time for the practical. Ask the training site what is scheduled before the next exam date.

This site and the Crane Exam Prep app are independent practice, built to sit alongside that training. The app keeps a readiness score by topic, so you can see which domain to take back to class.

FAQ

OECP study questions

Is there an official OECP study guide?
The closest thing is the OECP Crane Operator Candidate Manual, which is free on oecp.org. It has the exam outlines, 45 sample questions with answers, sample load charts and a reference list. OECP says it does not supply other study materials.
What is on the OECP written test?
For mobile cranes the manual lists three domains: standards (about 15%), operations (about 58%) and load charts (about 27%). The tower exam is pre-operations, operations and technical. The overhead exam is standards, pre-operations and operations.
Where can I get OECP training?
From your IUOE local's training site. OECP does not conduct training for its exams and directs candidates to their local for classes and refreshers.
What score do I need to pass the OECP written exam?
A scaled score of 500 on a scale of 200 to 800. OECP does not publish a percent-correct pass mark.
Can I use a calculator on the OECP exam?
No. Personal calculators are prohibited. Pencils and scratch paper are provided. Practice the math by hand.
Which load charts are on the OECP exam?
OECP hands out the load charts in the exam room and they stay there. The candidate manual's sample questions use a Manitowoc 222 chart for mobile cranes and a Peiner SK 405 chart for tower cranes, which shows the kind of chart to expect.
How long do I have for each question?
The crane written exams give you two hours for 75 questions, about 96 seconds each. The recertification exam gives 1.5 hours for 50 questions.

Keep going

One free practice test shows you where you stand.

25 questions. No sign-up. Every answer explained.

Start the free practice test
More practice questionsFree account, no card
Open the app