Signal person certificationSignals
OSHA's construction crane rule sets one standard method for hand signals, printed in Appendix A to Subpart CC. Operators and signal persons are both tested on it, and hand signals are a scored part of every OECP crane practical.
The short answer
OSHA's Standard Method has 19 hand signals. The two to know first: stop is one arm extended to the side, palm down, swung back and forth, and emergency stop is the same with both arms. Anyone may give a stop signal and the operator must obey it. Otherwise only one person signals a crane at a time.
Checked November 2026 against OSHA Subpart CC Appendix A, Standard Hand Signals, 29 CFR 1926.1419, 29 CFR 1926.1428 and the OECP Crane Operator Candidate Manual.
These are the signals in OSHA's Appendix A, described in plain words. Use the appendix itself, or the chart posted on your crane, for the drawings.
| Signal | How it is given |
|---|---|
| Stop | One arm extended to the side, palm down, swung back and forth |
| Emergency stop | Both arms extended to the sides, palms down, swung back and forth |
| Hoist | Upper arm out to the side, forearm and index finger pointing straight up, hand making small horizontal circles |
| Lower | Arm and index finger pointing down, hand making small horizontal circles |
| Raise boom | Arm extended to the side, thumb pointing up, other fingers closed |
| Lower boom | Arm extended to the side, thumb pointing down, other fingers closed |
| Swing | Arm extended, index finger pointing the way the boom is to swing |
| Raise the boom and lower the load | Arm extended, thumb pointing up, fingers opening and closing for as long as the load should move |
| Lower the boom and raise the load | Arm extended, thumb pointing down, fingers opening and closing for as long as the load should move |
| Extend telescoping boom | Both hands in front at waist level, thumbs pointing outward, other fingers closed |
| Retract telescoping boom | Both hands in front at waist level, thumbs pointing at each other, other fingers closed |
| Travel, or tower travel | Fingers pointing up, arm pushed out and drawn back in the direction of travel |
| Crawler crane travel, both tracks | Fists rotated around each other in front of the body. Rotating away from the body means forward, toward the body means backward |
| Crawler crane travel, one track | One raised fist marks the track to lock. The other fist rotates in front of the body to show which way the other track travels |
| Trolley travel | Palm up, fingers closed, thumb pointing the way the trolley is to go, hand jerked horizontally in that direction |
| Use main hoist | A hand taps the top of the head, then the regular signal follows |
| Use auxiliary hoist (whipline) | Forearm held vertical, the elbow tapped with the other hand, then the regular signal follows |
| Move slowly | One hand held still in front of the hand that is giving the action signal |
| Dog everything | Hands held together at waist level |
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: D. OSHA 1926.1419. 1926.1419 requires a qualified signal person whenever the load or load path leaves the operator’s view.
Answer: A. Safely stop operations until reliable communication is restored. 1926.1419(d)-(e) require that if the signal person can no longer communicate reliably with the operator, crane movements stop until communication is restored.
Answer: D. Only one. There shall be only one designated signal person assigned to the lift.
Answer: B. A qualified signal person who meets the qualification requirements of Subpart CC. 1926.1428 requires signal persons to be qualified; when signals are used during A/D, a qualified signal person must give them.
Answer: D. Anyone who observes a hazard. Although only the designated signal person gives operational signals, a stop signal may be given by anyone, and the operator must obey it.
Answer: D. Qualified by a third-party evaluator or the employer's qualified evaluator, and knowledgeable of the signals used. 1926.1428 requires signal persons to be qualified (by a third party or the employer's qualified evaluator), know the applicable signals, and understand crane dynamics.
Your result
25 questions, no sign-up, every answer explained.
| When a signal person is required | When the point of operation is not in full view of the operator, when the view in the direction of travel is obstructed, or when the operator or the person handling the load decides one is needed |
|---|---|
| Types of signal | Hand, voice, audible or new signals |
| Which hand signals | The Standard Method in Appendix A. A non-standard signal is allowed only where the standard one is infeasible or does not cover the operation, and only if the signal person, operator and lift director agree on it beforehand |
| Who signals | Only one person gives signals to a crane at a time |
| Stop signals | Anyone who sees a safety problem must give the stop or emergency stop signal, and the operator must obey it |
| Point of view | Directions are given from the operator's perspective |
| Lost contact | If the signals are interrupted, the operator stops until contact is restored |
| Charts | Hand signal charts are posted on the equipment or in plain view nearby |
Sources: 29 CFR 1926.1419 and 29 CFR 1926.1422.
| Agree first | The operator, signal person and lift director settle the voice signals before the lift |
|---|---|
| Order of each signal | The function and direction, then the distance or speed, then the function and the stop command |
| Equipment check | Radios and other devices are tested on site before operations begin |
| Channel | A dedicated channel, with limited exceptions |
| Hands-free | The operator must be able to receive signals without using their hands |
Sources: 29 CFR 1926.1420 and 29 CFR 1926.1421.
Signal persons must be qualified before they signal. Under 1926.1428 that means knowing the Standard Method, and passing an oral or written test and a practical test. Signal person certification.
Crane operators meet hand signals on the OECP practical. The 2025 manual lists them as a test on the mobile, tower and overhead practicals, and the tower practical uses at least four signals from ASME B30.3. The OECP practical exam.
On the OECP Signal Person Rigger practical, each hand signal has to be given within five seconds. Signal Person Rigger practice test.
FAQ
Guide
What OSHA requires, the OECP exam and 12 practice questions.
Signal person certificationGuide
Every test on the mobile, tower and overhead practicals, with time limits.
OECP practical examPractice test
One OECP certification for signaling and rigging together.
Signal person rigger practice test25 questions. No sign-up. Every answer explained.