Guide
Wire rope inspection
OSHA's broken-wire limits and the three deficiency categories.
Wire rope inspectionInspections
OSHA's construction crane rule spells out what gets looked at, how often, and by whom. The shift inspection is the one operators do, and its 14 items are a ready-made checklist.
The short answer
OSHA requires three routine crane inspections. Each shift, a competent person makes a visual inspection of 14 listed items. Monthly, the same inspection is done and documented, with the record kept at least three months. At least every 12 months, a qualified person makes a comprehensive inspection, with the record kept at least 12 months.
Checked November 2026 against the text of 29 CFR 1926.1412 and 29 CFR 1926.1413.
A competent person does this visual inspection before each shift, or during it. No disassembly is required.
| Item | Looking for |
|---|---|
| Control mechanisms | Maladjustments that interfere with proper operation |
| Control and drive mechanisms | Excessive wear and contamination |
| Air, hydraulic and other pressurized lines | Deterioration or leaks |
| Hydraulic system | Proper fluid level |
| Hooks and latches | Deformation, cracks, excessive wear or damage |
| Wire rope reeving | Compliance with the manufacturer's specifications |
| Wire rope | The deficiencies listed in 1926.1413 |
| Electrical apparatus | Malfunction, deterioration, dirt or moisture |
| Tires | Inflation and condition |
| Ground conditions | Proper support, including settling under the outriggers and water |
| Level position | Within the manufacturer's tolerance, before each shift and after each move and setup |
| Operator cab windows | Cracks or other defects that block the view |
| Rails, rail stops and rail clamps | On rail-travelling equipment |
| Safety devices and operational aids | Proper operation |
Source: 29 CFR 1926.1412, paragraph (d).
If the inspection finds a deficiency, the competent person decides at once whether it is a safety hazard. If it is, the crane is out of service until it is corrected.
| Inspection | When | Who | Record |
|---|---|---|---|
| Shift | Each shift the crane is used | Competent person | Not required |
| Monthly | Each month the crane is in service | Competent person | Items checked, results, and the inspector's name, signature and date. Kept at least 3 months |
| Annual, or comprehensive | At least every 12 months | Qualified person | Kept at least 12 months |
| After modification | Before first use | Qualified person, with functional testing | |
| After a safety-related repair or adjustment | Before first use | Qualified person, with functional testing | |
| After assembly | On completion | Qualified person, to confirm the configuration matches the manufacturer's criteria | |
| Idle three months or more | Before use | Qualified person, to the monthly standard | |
| After severe service | Before further use | Qualified person |
Source: 29 CFR 1926.1412.
25 questions, no sign-up, every answer explained.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: B. Monthly to annually. OSHA 1910.180(d)(2)(ii): periodic inspections are 1 to 12 month (monthly to annually) intervals.
Answer: C. The wire rope manufacturer's certification. A rope manufacturer's certification documents construction, grade, and rated properties.
Answer: B. A test lifting a specified test load, typically up to 110% of rated capacity per the governing standard, to verify load-bearing performance. Load tests use a controlled test load defined by the standard (commonly not exceeding 110% of rated load) after repairs, modifications, or initial installation.
Answer: C. Running ropes. 1910.180 requires a dated, signed monthly certification record of running-rope (and critical-item) inspections kept on file.
Answer: C. One-third of the original wire diameter. Removal is required at roughly one-third wear of the outer individual wires.
Answer: D. Initial use. 1910.180(d)(1) requires new, reinstalled, altered, or modified cranes to be inspected prior to initial use.
Answer: A. Allow movement between the upperworks and carrier and lead to bearing failure. Loose or missing swing-bearing bolts compromise the connection between the rotating bed and carrier, risking failure.
Answer: A. Before or during each shift the equipment is used. 1926.1412(d) requires the competent person to begin the visual inspection before or during each shift the crane is used.
Your result
The annual inspection covers everything in the shift inspection, with disassembly where needed, plus a list of its own. The qualified person inspects:
It includes functional testing. Wire rope has its own annual inspection, over its full length. Wire rope inspection.
Overhead cranes in a plant follow a different rule, 1910.179, with frequent and periodic inspections. Overhead crane inspection.
Tower cranes follow 1926.1412 and add their own items, such as tower bolts and tie-ins. Tower crane inspections.
Recognizing shift inspection items is also part of the practical test OSHA requires for operator certification. Operator requirements.
FAQ
Guide
OSHA's broken-wire limits and the three deficiency categories.
Wire rope inspectionGuide
Frequent and periodic inspections under OSHA 1910.179, with questions.
Overhead crane inspectionGuide
The construction crane rule, section by section, with the numbers to know.
OSHA 1926 Subpart CC25 questions. No sign-up. Every answer explained.