Two-blockingOperational aids
The LMI is the crane's own running check on the load chart. It is also an operational aid under OSHA's rule, which means there is a deadline for fixing it and a fallback when it is down.
The short answer
A load moment indicator senses the overturning moment, which is the load times the radius, compares it with the crane's rated capacity, and shows how close you are. A load moment limiter goes a step further and cuts out the functions that would increase the load. OSHA requires cranes built after March 29, 2003 and rated over 6,000 pounds to have a load weighing device, an LMI or a limiter. A failed one must be repaired within 30 calendar days.
Checked November 2026 against the text of 29 CFR 1926.1416, 29 CFR 1926.1415 and 29 CFR 1926.1401.
OSHA defines both in 1926.1401. It also calls them rated capacity indicators and rated capacity limiters.
| Device | What it does |
|---|---|
| Load moment (rated capacity) indicator | Senses the overturning moment on the crane, which is load multiplied by radius. Compares it with the rated capacity and tells the operator what share of capacity is in use |
| Load moment (rated capacity) limiter | Senses the same thing. When rated capacity is reached, it shuts off power to the functions that would increase the loading: hoisting up, telescoping out or luffing out |
| Load weighing device | Measures the weight on the hook |
Source: 29 CFR 1926.1401.
The moment is why an LMI needs to know the configuration. The same load is a bigger moment at a longer radius, so the device has to be set for the boom length, outrigger position and parts of line in use.
| Which cranes | Equipment built after March 29, 2003 with a rated capacity over 6,000 pounds. Derricks and articulating cranes have their own rules |
|---|---|
| What it must have | At least one of: a load weighing device, a load moment or rated capacity indicator, or a load moment or rated capacity limiter |
| Category | Category II operational aid |
| Repair deadline | 30 calendar days after the deficiency occurs. If a part is ordered within 7 days, 7 days after it arrives |
| Meanwhile | The weight of the load is found from a reliable source, by a calculation method or by other means, and given to the operator before the lift |
| Tower cranes | A load moment limiting device is a Category I aid, with the 7-day deadline |
Sources: 29 CFR 1926.1416 and 29 CFR 1926.1435.
25 questions, no sign-up, every answer explained.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: D. With a tape measure. If the boom length indicator fails, you can use a tape measure to verify boom length.
Answer: A. Its calibration. The handbook repeatedly notes dynamometers, cable weighing scales, and crane load indicating or moment systems must be checked for calibration.
Answer: A. Radii or boom angle must be determined with a measuring device. 1926.1416(e)(1) allows operations to continue if radii or boom angle are determined by measuring with a measuring device.
Answer: D. stop until the aid is repaired or approved temporary measures are set. Under 1926.1416(c) the operator must safely stop until the temporary alternative measures specified in 1926.1416 (for an ATB: mark the cable and use a spotter when extending the boom) are in place or the device works again.
Answer: D. December 16, 1969. 1926.1416(d)(1)(i) requires a boom hoist limiting device for equipment manufactured after December 16, 1969; older equipment must use at least one of the temporary alternative measures.
Answer: C. The hoist drum is not visible from the operator's station. If the operator cannot see the hoist drum from the station, a drum rotation indicator is required; the alternative is marking the drum with mirrors or cameras as needed.
Answer: D. Shuts off power to functions that can increase the severity of loading when rated capacity is reached, while the indicator only warns. Per 1926.1401, a load moment indicator senses overturning moment and warns of approaching overload; a load moment limiter shuts off power to load-increasing functions (hoisting, telescoping out, luffing out) when rated capacity is reached, while lowering functions remain operational.
Your result
Operational aids give the operator information or take control of a function. Each has a temporary alternative measure for use while it is being repaired.
| Operational aid | Category | Repair within |
|---|---|---|
| Boom hoist limiting device | I | 7 days |
| Luffing jib limiting device | I | 7 days |
| Anti-two-block device | I | 7 days |
| Boom angle or radius indicator | II | 30 days |
| Jib angle indicator, with a luffing jib | II | 30 days |
| Boom length indicator, on telescopic booms | II | 30 days |
| Load weighing device, LMI or limiter | II | 30 days |
| Outrigger or stabilizer position sensor, on equipment built after November 8, 2011 | II | 30 days |
| Hoist drum rotation indicator, where the drum is not visible, on equipment built after November 8, 2011 | II | 30 days |
Source: 29 CFR 1926.1416. Days are calendar days.
OSHA lists safety devices separately, in 1926.1415. The crane cannot operate unless every one of them works, and there is no alternative measure:
An exam question that asks what to do when a device fails turns on which list it is on. Boom stop broken: stop. LMI broken: verify the load weight another way and repair within 30 days.
An LMI is an aid. OSHA still requires the operator to stay within rated capacity and to know the load weight. Under 1926.1417, if a check with a load weighing device or LMI shows the load is over 75% of rated capacity at the longest radius to be used, the operator does not proceed until the weight is verified.
It also depends on being set up correctly, and it does not read the ground under the outriggers. How to read a load chart is still the skill underneath it.
FAQ
Guide
What two-blocking is and when OSHA requires an anti-two-block device.
Two-blockingGuide
A step-by-step method, gross and net capacity, and eight questions.
How to read a crane load chartGuide
OSHA's shift, monthly and annual inspections, item by item.
Crane inspection checklist25 questions. No sign-up. Every answer explained.