Guide
Load moment indicator (LMI)
What an LMI does, when OSHA requires one, and the other operational aids.
Load moment indicator (LMI)Operational aids
Two-blocking is one of the classic ways to drop a load: the hoist keeps pulling after the block has run out of room. OSHA's answer is the anti-two-block device, with different rules by crane type and build date.
The short answer
Two-blocking happens when the load block, hook block or overhaul ball is drawn up into the boom tip or upper block. It binds the system, and more hoisting force can part the rope. OSHA requires telescopic boom cranes built after February 28, 1992 to have a device that automatically prevents the damage. If it stops working it must be repaired within 7 calendar days, with the cable marked or a spotter posted meanwhile.
Checked November 2026 against the text of 29 CFR 1926.1416, 29 CFR 1926.1401, 29 CFR 1926.1431 and 29 CFR 1926.1435.
OSHA defines two-blocking in 1926.1401 as a condition in which a component that is uppermost on the hoist line, such as the load block, hook block or overhaul ball, comes in contact with the boom tip, fixed upper block or similar component. That binds the system. If the force keeps coming, the hoist rope or another component can fail.
It can happen three ways on a telescopic crane: hoisting up too far, booming down with the block near the tip, or extending the boom without paying out line. The last two catch people out because the hoist lever is not moving.
| Equipment | Requirement |
|---|---|
| Telescopic boom cranes built after February 28, 1992 | A device that automatically prevents damage from two-blocking |
| Lattice boom cranes built after February 28, 1992 | A device that either warns the operator in time or automatically prevents the damage |
| Lattice boom cranes built after November 8, 2011 | A device that automatically prevents the damage |
| Articulating cranes with a load hoist, built after December 31, 1999 | A device that automatically prevents the damage |
| Tower cranes | An anti-two-block device, as a Category I operational aid |
| Any crane hoisting personnel | An anti-two-block device at every point where two-blocking could occur. No alternative measure is allowed |
| Dedicated pile drivers | The anti-two-block requirement does not apply |
Sources: 29 CFR 1926.1416, 29 CFR 1926.1431, 29 CFR 1926.1435 and 29 CFR 1926.1439.
25 questions, no sign-up, every answer explained.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: A. A device that automatically prevents damage from contact between the load block or overhaul ball and the boom tip (anti two-block device). 1926.1416(d)(3)(i) requires an anti two-block device on telescopic boom cranes manufactured after February 28, 1992, preventing damage at all points where two-blocking could occur.
Answer: A. a two-block prevention (damage-prevention) device. For personnel hoisting the hook must be physically prevented from two-blocking — a warning alarm alone is not sufficient.
Answer: D. Mark the cable and have a spotter watch it. If the anti-two block device fails, you can mark the cable and have a spotter watch it as a temporary measure.
Answer: B. Prevent any crane movements that will cause a two-block condition. A two-block damage prevention system locks out the crane functions (hoist up, boom down/extend) that would cause two-blocking.
Answer: C. The hook block or ball contacts the boom-tip (upper) sheaves. Two-blocking is the lower load block/ball being drawn up into the boom-tip sheaves — the very event the anti-two-block device is meant to prevent.
Answer: D. The lower load block/hook contacting the boom tip (upper block/sheave). Two-blocking is when the hook/lower block is drawn up into the boom-tip sheaves, which can part the rope and drop the load; an anti-two-block device helps prevent it.
Answer: C. Category I. The anti-two-block is a Category I operational aid — 7-day repair window. Trap: it is an aid, but the fast-repair Category I kind, not Category II like the LMI.
Answer: C. A component uppermost on the hoist line, such as the load block or overhaul ball, comes in contact with the boom tip or fixed upper block. The 1926.1401 definition: two blocking occurs when the load block, hook block, overhaul ball or similar component contacts the boom tip or fixed upper block, binding the system so continued power can fail the hoist rope.
Your result
| Category | The anti-two-block device is a Category I operational aid |
|---|---|
| Repair deadline | No later than 7 calendar days after the deficiency occurs |
| Parts on order | If a part is ordered within 7 calendar days, the repair is due within 7 calendar days of receiving it |
| Meanwhile | A temporary alternative measure: clearly mark the cable where the operator can see it in time to stop the hoist, or use a spotter |
| Hoisting personnel | No alternative. If the device is not working, personnel hoisting stops until it is repaired |
Sources: 29 CFR 1926.1416 and 29 CFR 1926.1431.
Do not confuse operational aids with safety devices. A failed safety device, such as a boom stop or the horn, stops the crane with no alternative measure at all. Operational aids and safety devices compared.
FAQ
Guide
What an LMI does, when OSHA requires one, and the other operational aids.
Load moment indicator (LMI)Guide
OSHA 1926.1431: the 50% rule, trial lifts, proof tests and wind.
Crane man basket rulesGuide
Hydraulic boom cranes: the aids OSHA requires and OECP's size classes.
Telescopic boom crane25 questions. No sign-up. Every answer explained.