1. Home
  2. ASME B30.2

ASME overhead crane standard

ASME B30.2: overhead and gantry cranes

B30.2 is the ASME standard for the overhead cranes found in shops, mills and plants. OSHA's overhead crane rule was written around its 1967 edition, and OECP lists the standard among its exam references.

The short answer

ASME B30.2 applies to overhead and gantry cranes with a top-running bridge and a top-running trolley hoist, hand operated or power driven, used for vertical lifts of unguided loads. It covers construction and installation, inspection and testing, operation and maintenance. Underhung cranes are covered by B30.17, not B30.2.

Checked November 2026 against the Mazzella reference guide to the ASME B30 standards, 29 CFR 1910.179 and 29 CFR 1926.1438.

What B30.2 covers

Scope of ASME B30.2
TitleOverhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)
Applies toHand-operated and power-driven overhead and gantry cranes with a top-running single-girder or multiple-girder bridge and one or more top-running trolley hoists
Also includedCranes of the same basic kind, such as cantilever gantry, semi-gantry and wall cranes
Used forVertical lifting and lowering of freely suspended, unguided loads
Not coveredSpecial-purpose cranes, such as those for non-vertical lifts, guided loads or lifting people
Underhung cranes and monorailsCovered by ASME B30.17

Source: Mazzella reference guide to the ASME B30 standards.

ASME sells its standards and does not publish the text for free. This page describes what the volume covers and how it is organized, from published summaries. The practice questions cite the paragraphs they are drawn from. For clause-level work, use a current copy of the standard.

8 practice questions on ASME B30.2

Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.

  1. ASME B30.2 Standard

    1. According to ASME B30.2, what is the broken-wire removal criterion for running ropes?

    Show answer

    Answer: C. Twelve randomly distributed broken wires in one lay or four broken wires in one strand in one lay. Removal criteria include twelve randomly distributed broken wires in one lay or four broken wires in one strand in one lay.

  2. ASME B30.2 Standard

    2. According to ASME B30.2, prior to the initial use of any hoist during each shift, the operator shall verify what?

    Show answer

    Answer: D. Operation of the upper limit device under no-load conditions, inching the block into the limit or running in at slow speed. Prior to initial use during each shift, the operator shall verify operation of the upper limit device under no-load conditions, with care exercised by inching the block into the limit or running in at slow speed; if it does not operate properly, the operator shall immediately notify the designated person.

  3. ASME B30.2 Standard

    3. According to ASME B30.2, what minimum fire extinguisher rating is required for the extinguisher installed in a crane cab?

    Show answer

    Answer: D. 10 BC. A portable fire extinguisher with a basic minimum extinguisher rating of 10 BC shall be installed in the cab.

  4. ASME B30.2 Standard

    4. According to ASME B30.2, a 'standby crane' is defined as what?

    Show answer

    Answer: A. A crane not in regular service that is used occasionally or intermittently as required. A standby crane is a crane not in regular service that is used occasionally or intermittently as required.

  5. ASME B30.2 Standard

    5. According to ASME B30.2, power-driven hoists shall be designed and constructed so that the load block does what?

    Show answer

    Answer: B. Shall not exceed the upper limit of travel, whether loaded or empty. Power-driven hoists shall be designed so the load block, either loaded or empty, shall not exceed the upper limit of travel.

  6. ASME B30.2 Standard

    6. When the runway rails serve as the anchorage for a storage bridge crane's rail clamps, what is required?

    Show answer

    Answer: D. The rails must be secured to withstand the resultant forces applied by the clamp, and the clamping area kept free of projections or obstructions. A clamp is only as good as what it grips. If the rail can lift or shift, or the jaws land on an obstruction, the clamp will not hold, and clamps are applied only when the crane is not in motion.

  7. ASME B30.2 Standard

    7. According to ASME B30.2, when U-bolt wire rope clips are used, how shall they be attached?

    Show answer

    Answer: C. With the U-bolt over the dead end of the rope and the live rope resting in the clip saddle. U-bolt clips shall have the U-bolt over the dead end of the rope and the live rope resting in the clip saddle; clips shall be tightened evenly and nuts retightened after initial loading.

  8. ASME B30.2 Standard

    8. According to ASME B30.2, what should the operator do if there is a question whether the total load to be lifted exceeds the rated load?

    Show answer

    Answer: D. Verify the weight of the total load before lifting. The operator shall verify the weight of the total load if there is a question whether it exceeds the rated load of the crane and/or hoist(s), and shall not use a load-limiting device to measure the load.

Free OECP practice test

25 questions, no sign-up, every answer explained.

Start now

How B30.2 is organized

Chapters of ASME B30.2
ChapterSubject
2-0Scope, definitions, references and personnel competence
2-1General construction and installation
2-2Inspection and testing
2-3Operator training and operation
2-4Maintenance training and maintenance

Source: Mazzella reference guide to the ASME B30 standards.

B30.2 and OSHA

OSHA's rule for these cranes is 29 CFR 1910.179. It requires overhead and gantry cranes installed on or after August 31, 1971 to meet the design specifications of ANSI B30.2.0-1967, the standard's edition at the time.

On construction sites, 29 CFR 1926.1438 points to a later edition. An overhead or gantry crane that is not permanently installed in a facility must meet parts of ASME B30.2-2005 if it was built on or after September 19, 2001.

The standard has been revised many times since 1967, and it now goes further than the regulation in places. One example from the questions above: B30.2 gives a numeric broken-wire count for running ropes, while 1910.179 requires a monthly rope inspection without one. OSHA 1910.179 in detail.

FAQ

ASME B30.2 questions

What is ASME B30.2?
The ASME safety standard for overhead and gantry cranes with a top-running bridge and a top-running trolley hoist.
Does ASME B30.2 cover underhung cranes?
No. Cranes and monorails with an underhung trolley or bridge are covered by ASME B30.17.
How is ASME B30.2 related to OSHA 1910.179?
OSHA 1910.179 requires overhead and gantry cranes installed on or after August 31, 1971 to meet ANSI B30.2.0-1967, the 1967 edition of the standard. Later editions of B30.2 are more detailed than the regulation.
What does ASME B30.2 say about inspections?
Chapter 2-2 covers inspection and testing. The practice questions on this page include several drawn from it, such as the types of inspection and how limit devices are checked.
Is ASME B30.2 on the OECP exam?
OECP does not publish its questions. Its candidate manual lists the references the written exams are built from, including OSHA 29 CFR 1926.1400 to 1442, OSHA 1926.251, OSHA 1910.179 and 1910.180, and ASME B30.2, B30.3, B30.4, B30.5 and B30.23. See the OECP study guide for the outline.
Are these real exam questions?
No. They are original practice questions written from the OSHA rules and ASME B30 standards that crane exams draw on. OECP does not release its questions, and this site is not affiliated with OECP or the IUOE.

Keep going

One free practice test shows you where you stand.

25 questions. No sign-up. Every answer explained.

Start the free practice test
More practice questionsFree account, no card
Open the app