OSHA overhead crane standard

OSHA 1910.179: overhead and gantry cranes

1910.179 is OSHA's general industry rule for overhead and gantry cranes. It is on OECP's reference list for the crane exams, and it is full of specific numbers. The ones worth knowing are below.

The short answer

29 CFR 1910.179 applies to overhead and gantry cranes, including semigantry, cantilever gantry, wall and storage bridge cranes. It requires the rated load marked on each side of the crane, 3 inches of overhead and 2 inches of lateral clearance, frequent and periodic inspections, a monthly rope inspection with a signed record, and at least two wraps of rope on the drum.

Checked November 2026 against the text of 29 CFR 1910.179 in the Code of Federal Regulations (OSHA's page for the section) and 29 CFR 1926.1438.

1910.179 numbers to know

Requirements with the paragraph they come from
Who may operateOnly designated personnel, under (b)(8)
Design standardCranes installed on or after August 31, 1971 must meet ANSI B30.2.0-1967, under (b)(2)
Rated load markingOn each side of the crane, and on each hoist or load block when there is more than one hoisting unit, under (b)(5)
Clearance from obstructionsAt least 3 inches overhead and 2 inches laterally, under (b)(6)
Footwalk headroomAt least 48 inches, under (d)(1)
Holding brake torqueAt least 125% of full load hoisting torque with non-mechanical control braking, or 100% with mechanical control braking, under (f)(2)
Pendant push-button voltageNo more than 150 volts AC or 300 volts DC, under (g)(1)
Pendant buttonsReturn to the off position when released, under (g)(3)
Rope loadingRated load divided by the number of parts of rope must not exceed 20% of the rope's nominal breaking strength, under (h)(2)
Rope on the drumAt least two wraps with the hook in its lowest position, under (h)(2)
Rope clipsThe U-bolt goes on the dead, or short, end of the rope, under (h)(2)
Warning deviceA gong or other warning signal on power-traveling cranes, except floor-operated ones, under (i)
Rated load testNot more than 125% of the rated load, unless the manufacturer recommends otherwise, under (k)(2)

Source: 29 CFR 1910.179. Read the section on OSHA's site.

7 practice questions on OSHA's overhead crane rule

Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.

  1. Overhead Crane

    1. According to O.S.H.A., power supply to the runway shall be controlled by?

    Show answer

    Answer: B. The switch or circuit breaker. OSHA requires the runway conductors' power supply to be controlled by a switch or circuit breaker so power can be positively disconnected, e.g. for maintenance or emergencies.

  2. Overhead Crane

    2. Per OSHA, outdoor storage bridges must be provided with which two protections?

    Show answer

    Answer: B. Automatic rail clamps and a wind indicator with alarm at a predetermined wind velocity. Outdoor storage bridges must have automatic rail clamps and a wind indicator giving a visible or audible alarm at a predetermined wind velocity.

  3. Overhead Crane

    3. What is the purpose of the upper limit switch (the only one required by O.S.H.A.)?

    Show answer

    Answer: C. limit the hoist travel. The upper limit switch limits hoist travel, stopping the block before it contacts the trolley; it is the only limit switch OSHA 1910.179 specifically requires.

  4. Overhead Crane

    4. Cranes shall not be used for side pulls unless:

    Show answer

    Answer: C. Specifically authorized by a responsible person. OSHA 1910.179 prohibits side pulls unless a qualified/responsible person specifically authorizes it after determining the crane won't be damaged and stability isn't endangered.

  5. Overhead Crane

    5. Per OSHA, the rated load divided by the number of parts of hoist rope must not exceed what percentage of the rope's normal breaking strength?

    Show answer

    Answer: C. 20 percent. Hoist rope strength requires that rated load divided by number of parts of rope not exceed 20 percent of the rope's normal breaking strength — a 5:1 factor.

  6. Overhead Crane

    6. According to O.S.H.A., how many wraps must be left on the hoist drum of an overhead crane with the hook at its lowest position?

    Show answer

    Answer: D. 2 wraps. OSHA 1910.179 requires no less than two wraps of rope to remain on the drum when the hook is in its lowest position, so the rope anchor is never the sole attachment carrying the load.

  7. Overhead Crane

    7. According to O.S.H.A., the rated capacity of all overhead cranes shall be?

    Show answer

    Answer: C. clearly marked on the side of the crane. OSHA 1910.179 requires the rated load to be plainly marked on each side of the crane so it is legible from the ground or floor.

Free OECP practice test

25 questions, no sign-up, every answer explained.

Start now

Inspections under 1910.179

The rule sorts inspections by how often they happen.

Inspection classes in 1910.179(j) and (m)
InspectionWhenWhat
InitialBefore first use of a new or altered craneThe whole crane
FrequentDaily to monthly intervalsOperating mechanisms, air and hydraulic leaks, hooks and hoist chains. Hooks and chains get a monthly inspection with a certification record
PeriodicIntervals of 1 to 12 monthsStructure, brakes, power plant and electrical items
Running ropesAt least once a monthA thorough inspection with a signed certification record
Idle one month to under six monthsBefore going back into serviceA frequent-type inspection plus the rope inspection
Idle more than six monthsBefore going back into serviceA complete inspection
Standby cranesAt least every six monthsA frequent-type inspection plus the rope inspection

Source: 29 CFR 1910.179(j) and (m).

Handling the load and making repairs

Paragraph (n) sets the basic handling rules:

  • The crane is not loaded beyond its rated load, except for test purposes
  • The hoist rope is free of kinks and is not wrapped around the load
  • The load is attached to the hook with slings or other approved devices
  • The load is well secured and balanced before it is lifted more than a few inches

Paragraph (l) covers maintenance. Before repairs start, the crane is run to a spot where it interferes least, all controllers are set to off, the main switch is opened and locked, and warning or out of order signs go up. Rail stops protect it if other cranes share the runway. The employer must also keep a preventive maintenance program based on the manufacturer's recommendations.

1910.179 on a construction site

OSHA's construction crane rule hands some overhead cranes back to 1910.179. Under 29 CFR 1926.1438, an overhead or gantry crane that is permanently installed in a facility follows 1910.179 and not Subpart CC.

One that is not permanently installed follows Subpart CC, along with parts of 1910.179 and ASME B30.2-2005 for cranes built on or after September 19, 2001. More on ASME B30.2.

FAQ

OSHA 1910.179 questions

What does OSHA 1910.179 cover?
Overhead and gantry cranes, including semigantry, cantilever gantry, wall cranes and storage bridge cranes.
How often must overhead cranes be inspected under OSHA?
Frequent inspections run at daily to monthly intervals and periodic inspections at intervals of 1 to 12 months. Running ropes get a thorough inspection at least once a month, with a signed record.
What is the load test limit in 1910.179?
Test loads must not be more than 125% of the rated load unless the manufacturer recommends otherwise.
Does OSHA 1910.179 require overhead crane operators to be certified?
It says only designated personnel may operate a crane covered by the section. It does not contain a certification requirement like the one in the construction crane rule.
How many wraps of rope must stay on the drum?
At least two wraps with the hook in its lowest position.
Are these real exam questions?
No. They are original practice questions written from the OSHA rules and ASME B30 standards that crane exams draw on. OECP does not release its questions, and this site is not affiliated with OECP or the IUOE.

Keep going

Guide

ASME B30.2

The overhead and gantry crane standard: scope, chapters and questions.

ASME B30.2

One free practice test shows you where you stand.

25 questions. No sign-up. Every answer explained.

Start the free practice test
More practice questionsFree account, no card
Open the app