Crane man basket: OSHA's personnel platform rules

Lifting people with a crane is allowed only when the ordinary ways of reaching the work are worse. When it is allowed, 29 CFR 1926.1431 sets tighter limits than any other lift.

The short answer

With a crane man basket, the total load must not exceed 50% of the crane's rated capacity. The crane must be within 1% of level with outriggers fully extended. An anti-two-block device is required and free fall is prohibited. The platform is proof tested to 125% of its rated capacity at each jobsite, and a trial lift is made before each shift.

Checked November 2026 against the text of 29 CFR 1926.1431.

The crane

Equipment rules in 29 CFR 1926.1431
CapacityThe total load, meaning the loaded platform plus the hook, load line and rigging, must not exceed 50% of the rated capacity for the radius and configuration
LevelWithin 1% of level grade, on footing a qualified person has found firm and stable
OutriggersAll extended and locked, with the same extension on each, as the manufacturer specifies
Anti-two-blockRequired at every point where two-blocking could occur
LoweringA controlled load lowering system, separate from the load line brake. Free fall is prohibited
IndicatorsA boom angle indicator the operator can see, a boom hoist limiting device, and on telescopic booms a boom length indicator or accurate marks
BrakesLoad and boom hoist brakes, swing brakes and locking features engaged whenever the occupied platform is stationary
If a device failsStop. No alternative measures are allowed for personnel hoisting

Source: 29 CFR 1926.1431, paragraphs (c) and (d).

The platform and its rigging

Platform rules in 29 CFR 1926.1431
DesignBy a qualified person familiar with structural design
StrengthAble to support its own weight plus at least five times the maximum intended load
LevelThe suspension system keeps the platform within 10 degrees of level
Guardrail and grab railA guardrail system enclosed from toeboard to mid-rail, and a grab rail inside the whole perimeter except at the gate
GateMust not swing outward, and has a device to stop it opening by accident
MarkingThe platform's weight and rated capacity posted on a plate or permanent marking
Rigging strengthHardware and hooks support at least five times the maximum intended load. Slings of rotation resistant rope support at least ten times
BridleLegs connected to a master link or shackle so the load is divided evenly. Wire rope sling eyes have thimbles
UseThe bridle and rigging are used only for the platform, never for other loads
OccupantsNo more than the platform is designed for, and no more than the work needs

Source: 29 CFR 1926.1431, paragraphs (e), (f) and (g).

Free OECP practice test

25 questions, no sign-up, every answer explained.

Start now

10 practice questions on hoisting personnel

Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.

  1. OSHA 1926 Subpart CC

    1. According to OSHA 1926.1431, the personnel platform itself must be capable of supporting, without failure, its own weight and at least:

    Show answer

    Answer: C. Five times the maximum intended load. 1926.1431(e)(4) requires the platform (excluding guardrails and PFAS anchorages) to support its own weight and at least 5 times the maximum intended load without failure.

  2. Mobile Crane Essentials

    2. Which OSHA standard covers personnel lifting with cranes?

    Show answer

    Answer: D. CFR 1926.1431. OSHA personnel lifting is covered by CFR 1926.1431.

  3. General Knowledge

    3. When using rotation resistant rope for personnel lifting, the crane's load line must be capable of supporting at least how many times the maximum intended load?

    Show answer

    Answer: A. 10. Rotation resistant rope used for personnel lifting requires a 10:1 design factor on the load line.

  4. Standards

    4. Which ASME standard covers personnel platforms (personnel lifting systems)?

    Show answer

    Answer: C. B30.23. ASME B30.23 governs personnel lifting systems, while B30.9 covers slings, B30.20 below-the-hook lifting devices, and B30.26 rigging hardware.

  5. Operation Aids

    5. When hoisting personnel with a telescoping boom crane, which additional indicator is specifically required?

    Show answer

    Answer: A. A boom length indicator. Cranes with telescoping booms must have a boom length indicator, just as variable-angle booms require a boom angle indicator.

  6. Operations

    6. Rigging that suspends a personnel platform must be designed to keep the platform within how many degrees of level?

    Show answer

    Answer: C. 10 degrees. The platform rigging must be designed so the suspended platform stays within 10 degrees of level.

  7. Operations

    7. For hoisting personnel with an outrigger-equipped crane, what does OSHA require of the outriggers?

    Show answer

    Answer: D. All outriggers extended the same amount and locked, per the manufacturer's procedures and load chart — hoisting personnel on rubber is not allowed. 1926.1431(c)(2) requires all outriggers or stabilizers to be extended and locked, with the same amount of extension on each and in accordance with the manufacturer's procedures and load charts.

  8. Operations

    8. How must a personnel platform access door swing?

    Show answer

    Answer: A. Inward, unless the platform is too small for an inward swing to allow safe entry. Access doors must not swing outward unless the platform is too small for the door to swing inward and still allow safe entry.

  9. Lift Director — Core

    9. When lifting personnel with a crane and personnel platform (1926.1431), the total load (platform, occupants, tools, and materials) must not exceed what fraction of the crane's rated capacity for the configuration?

    Show answer

    Answer: D. 50%. 1926.1431(d) limits the loaded personnel platform to no more than 50% of the crane's rated capacity for the radius and configuration used.

  10. OSHA 1926 Subpart CC

    10. According to OSHA 1926.1431, a pre-lift meeting for personnel hoisting must be attended by:

    Show answer

    Answer: A. The equipment operator, signal person (if used), employees to be hoisted, and the person responsible for the task. 1926.1431(m) requires a pre-lift meeting attended by the operator, signal person if used for the lift, employees to be hoisted, and the person responsible for the task; it must be held prior to the trial lift at each new work location and repeated for newly assigned employees.

Before anyone gets in

  1. Proof testAt each jobsite, and after any repair or modification, the platform and rigging are tested at 125% of the platform's rated capacity and held suspended for five minutes.
  2. Trial liftWith the platform empty of people and loaded at least to the anticipated lift weight, from the ground or entry point to each place it will go. It is done right before each shift in which people are hoisted, and again when the crane is moved or the route changes.
  3. Competent person's checkAfter the trial lift a competent person confirms the devices work, nothing interferes with the platform, and the lift stays within 50% of rated capacity.
  4. Pre-lift meetingAttended by the operator, the signal person if one is used, the employees to be hoisted and the person responsible for the task.
  5. Lift a few inchesWith the occupants aboard, the platform is raised a few inches and checked for balance and security before it goes up.

During the lift

Work practices in 29 CFR 1926.1431
WindWhen wind at the platform is over 20 mph, sustained or in gusts, a qualified person decides whether it is safe. If not, the lift does not start or is stopped
Fall protectionA personal fall arrest system attached to a structural member inside the platform, except over water
CommunicationThe people in the platform stay in direct communication with the signal person or the operator
Other load linesNot used while people are hoisted, except in pile driving
TravelNo travelling with people hoisted, with narrow exceptions that never apply to rubber-tired equipment
Power linesNot within 20 feet of a line up to 350 kV, or 50 feet of a line over 350 kV
Body positionOccupants keep all parts of the body inside the platform

Source: 29 CFR 1926.1431, paragraphs (k) and (n).

FAQ

Man basket questions

Can you lift people with a crane?
Only in a personnel platform that meets OSHA 1926.1431, with narrow exceptions such as drill shafts and pile driving. Equipment rated at 2,000 pounds or less must not be used to hoist personnel.
What percentage of capacity can a crane use with a man basket?
No more than 50% of the rated capacity for the radius and configuration, counting the loaded platform, hook, load line and rigging.
What is the proof test for a personnel platform?
125% of the platform's rated capacity, held suspended for five minutes, at each jobsite before hoisting people and after any repair or modification.
What is the wind limit for a man basket?
Over 20 mph at the platform, sustained or in gusts, a qualified person must decide whether the lift is safe. If it is not, hoisting does not begin or is stopped.
Is an anti-two-block required for hoisting personnel?
Yes, at every point where two-blocking could occur, and it must be working. No alternative measure is permitted.
How often is a trial lift required?
Immediately before each shift in which personnel will be hoisted, and again whenever the crane is moved and set up in a new location or the lift route changes.
Are these real exam questions?
No. They are original practice questions written from the OSHA rules and ASME B30 standards that crane exams draw on. OECP does not release its questions, and this site is not affiliated with OECP or the IUOE.

Keep going

One free practice test shows you where you stand.

25 questions. No sign-up. Every answer explained.

Start the free practice test
More practice questionsFree account, no card
Open the app