People look for one wind speed at which a crane has to stop. OSHA's construction rule does not give one for ordinary lifts. It gives a duty, one hard number for lifting people, and several requirements for knowing what the wind is doing.

The short answer

OSHA sets no single wind speed limit for normal crane lifts. A competent person must adjust the equipment or the operation for the effect of wind, ice and snow on stability and rated capacity, and the manufacturer's limits apply. The one number in the rule is for hoisting personnel: over 20 mph at the platform, a qualified person must decide whether the lift is safe.

Checked November 2026 against the text of 29 CFR 1926.1417, 29 CFR 1926.1431, 29 CFR 1926.1435 and 29 CFR 1910.179.

What the rules say about wind

Wind provisions in OSHA's crane rules
SituationRuleWhere
Any liftA competent person adjusts the equipment and the operation to address the effect of wind, ice and snow on stability and rated capacity1926.1417(n)
Storm warningWhen a local storm warning is issued, a competent person decides whether to carry out the manufacturer's recommendations for securing the equipment1926.1417(h)
Hoisting personnelWhen wind at the platform exceeds 20 mph, sustained or in gusts, a qualified person decides whether it is safe to lift. If not, the lift does not begin or is ended1926.1431(k)(8)
Tower cranesA wind speed indicator is a required Category II operational aid, mounted above the upper rotating structure1926.1435(e)
Tower crane erecting and climbingThe A/D director must address wind speed1926.1435(b)
Floating cranesThe manufacturer's charts for use on water must take at least a 40 mph wind into account1926.1437
Outdoor storage bridge cranesAutomatic rail clamps and a wind indicator that alarms at a set wind speed1910.179(b)(4)

Sources: OSHA 29 CFR 1926 Subpart CC and 29 CFR 1910.179.

6 practice questions on wind

Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.

  1. OSHA 1926 Subpart CC

    1. According to OSHA 1926.1431, when wind speed (sustained or gusts) at the personnel platform exceeds what value must a qualified person determine if it is safe to lift personnel?

    Show answer

    Answer: B. 20 mph. 1926.1431(k)(8)(i) requires a qualified person's determination when wind exceeds 20 mph at the platform; if unsafe, the operation must not begin or must be terminated.

  2. ASME B30.5 (Mobile Cranes)

    2. According to ASME B30.5, wind speed shall be monitored at all sites where it can adversely affect crane operations, preferably with a device mounted:

    Show answer

    Answer: B. At the highest unshielded point on the crane or located at the site. Para 5-3.2.1.6 requires wind speed monitoring where it can adversely affect operations, ideally with a device at the highest unshielded point on the crane or located at the site.

  3. OSHA 1926 Subpart CC

    3. According to OSHA 1926.1435, the wind speed indicator on a tower crane must be mounted:

    Show answer

    Answer: C. Above the upper rotating structure (or at or above jib level on self-erecting cranes). 1926.1435(e)(6)(v) requires the wind speed indicator above the upper rotating structure, or at or above jib level on self-erecting cranes; alternatives include wind data from another tower crane on site or a qualified person's estimate.

  4. Operations

    4. When leaving a telescopic swing cab crane unattended for long periods, the boom should be:

    Show answer

    Answer: A. fully retracted and stowed per manufacturer recommendation. Retracting and stowing the boom minimizes wind exposure and the chance of upset while no operator is present.

  5. OSHA 1926 Subpart CC

    5. According to OSHA 1926.1417(n), the competent person must adjust the equipment and/or operations to address the effect of which conditions on equipment stability and rated capacity?

    Show answer

    Answer: C. Wind, ice, and snow. 1926.1417(n) requires the competent person to adjust equipment/operations for the effects of wind, ice, and snow on stability and rated capacity.

  6. Technical Knowledge

    6. Wind blowing from BEHIND a crane during a lift is dangerous mainly because it:

    Show answer

    Answer: C. Pushes on the boom and load, driving the load out past the calculated radius. Wind force is transferred to the boom tip and the suspended load, moving the load farther out than the measured radius and quietly overloading the chart position.

Free OECP practice test

25 questions, no sign-up, every answer explained.

Start now

Where the working limit comes from

The number that stops your lift is in the crane's manual and load chart. OSHA requires employers to follow the manufacturer's procedures for operating the equipment, and manufacturers publish the wind speed their ratings assume and the speed at which the crane must be taken out of service or secured.

Those limits change with the setup. A long boom or jib and a load with a big surface both take more wind. The load chart's rated capacity can need reducing well before the shutdown speed. That is the judgment 1926.1417(n) gives to the competent person.

In practice

  • Know the crane's limits before the lift. Find the in-service and out-of-service wind speeds in the manual.
  • Measure at height. Wind at the boom tip is stronger than at the cab. The tower crane rule puts the indicator above the upper rotating structure.
  • Think about the load. A wide, light load such as formwork or a wall panel catches wind that a compact one does not.
  • Use tag lines to control the load. Near power lines they must be non-conductive. Power line rules.
  • Stop if you are in doubt. The operator has the authority to stop and refuse a load over a safety concern until a qualified person has decided it is safe.

FAQ

Crane wind questions

What is the maximum wind speed for crane operation?
OSHA does not set one number for ordinary lifts. The crane manufacturer's limits apply, and a competent person must adjust the operation for wind's effect on stability and rated capacity.
What is the wind speed limit for a man basket?
When wind at the personnel platform exceeds 20 mph, sustained or in gusts, a qualified person must decide whether it is safe to lift. If it is not, the lift does not start or is stopped.
Do tower cranes need a wind speed indicator?
Yes. OSHA lists a wind speed indicator as a Category II operational aid for tower cranes, mounted above the upper rotating structure.
Who decides whether it is too windy to lift?
A competent person adjusts operations for wind under 1926.1417. The operator can also stop and refuse a load over a safety concern until a qualified person has determined it is safe.
Does wind reduce a crane's capacity?
It can. Wind adds side load to the boom and pushes on the load, which is why OSHA names its effect on stability and rated capacity, and why manufacturers publish wind limits with their load charts.
Are these real exam questions?
No. They are original practice questions written from the OSHA rules and ASME B30 standards that crane exams draw on. OECP does not release its questions, and this site is not affiliated with OECP or the IUOE.

Keep going

One free practice test shows you where you stand.

25 questions. No sign-up. Every answer explained.

Start the free practice test
More practice questionsFree account, no card
Open the app