People look for one wind speed at which a crane has to stop. OSHA's construction rule does not give one for ordinary lifts. It gives a duty, one hard number for lifting people, and several requirements for knowing what the wind is doing.
The short answer
OSHA sets no single wind speed limit for normal crane lifts. A competent person must adjust the equipment or the operation for the effect of wind, ice and snow on stability and rated capacity, and the manufacturer's limits apply. The one number in the rule is for hoisting personnel: over 20 mph at the platform, a qualified person must decide whether the lift is safe.
Checked November 2026 against the text of 29 CFR 1926.1417, 29 CFR 1926.1431, 29 CFR 1926.1435 and 29 CFR 1910.179.
| Situation | Rule | Where |
|---|---|---|
| Any lift | A competent person adjusts the equipment and the operation to address the effect of wind, ice and snow on stability and rated capacity | 1926.1417(n) |
| Storm warning | When a local storm warning is issued, a competent person decides whether to carry out the manufacturer's recommendations for securing the equipment | 1926.1417(h) |
| Hoisting personnel | When wind at the platform exceeds 20 mph, sustained or in gusts, a qualified person decides whether it is safe to lift. If not, the lift does not begin or is ended | 1926.1431(k)(8) |
| Tower cranes | A wind speed indicator is a required Category II operational aid, mounted above the upper rotating structure | 1926.1435(e) |
| Tower crane erecting and climbing | The A/D director must address wind speed | 1926.1435(b) |
| Floating cranes | The manufacturer's charts for use on water must take at least a 40 mph wind into account | 1926.1437 |
| Outdoor storage bridge cranes | Automatic rail clamps and a wind indicator that alarms at a set wind speed | 1910.179(b)(4) |
Sources: OSHA 29 CFR 1926 Subpart CC and 29 CFR 1910.179.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: B. 20 mph. 1926.1431(k)(8)(i) requires a qualified person's determination when wind exceeds 20 mph at the platform; if unsafe, the operation must not begin or must be terminated.
Answer: B. At the highest unshielded point on the crane or located at the site. Para 5-3.2.1.6 requires wind speed monitoring where it can adversely affect operations, ideally with a device at the highest unshielded point on the crane or located at the site.
Answer: C. Above the upper rotating structure (or at or above jib level on self-erecting cranes). 1926.1435(e)(6)(v) requires the wind speed indicator above the upper rotating structure, or at or above jib level on self-erecting cranes; alternatives include wind data from another tower crane on site or a qualified person's estimate.
Answer: A. fully retracted and stowed per manufacturer recommendation. Retracting and stowing the boom minimizes wind exposure and the chance of upset while no operator is present.
Answer: C. Wind, ice, and snow. 1926.1417(n) requires the competent person to adjust equipment/operations for the effects of wind, ice, and snow on stability and rated capacity.
Answer: C. Pushes on the boom and load, driving the load out past the calculated radius. Wind force is transferred to the boom tip and the suspended load, moving the load farther out than the measured radius and quietly overloading the chart position.
Your result
25 questions, no sign-up, every answer explained.
The number that stops your lift is in the crane's manual and load chart. OSHA requires employers to follow the manufacturer's procedures for operating the equipment, and manufacturers publish the wind speed their ratings assume and the speed at which the crane must be taken out of service or secured.
Those limits change with the setup. A long boom or jib and a load with a big surface both take more wind. The load chart's rated capacity can need reducing well before the shutdown speed. That is the judgment 1926.1417(n) gives to the competent person.
FAQ
Guide
OSHA 1926.1431: the 50% rule, trial lifts, proof tests and wind.
Crane man basket rulesGuide
OSHA 1926.1435: foundations, plumb, climbing, devices and inspections.
Tower crane erecting and climbingGuide
A step-by-step method, gross and net capacity, and eight questions.
How to read a crane load chart25 questions. No sign-up. Every answer explained.