A crane is only as stable as what it stands on. OSHA splits the job in two: the site has to provide ground that can take the crane, and the crane crew has to set the outriggers the way the manufacturer says.
The short answer
OSHA requires the ground under a crane to be firm, drained and graded so that, with supporting materials such as blocking, mats or cribbing, the manufacturer's support and level requirements are met. The controlling entity must provide that. Outriggers must be fully extended, or set as the load chart specifies, with blocking placed only under the float or pad.
Checked November 2026 against the text of 29 CFR 1926.1402, 29 CFR 1926.1404, 29 CFR 1926.1412 and 29 CFR 1926.1415.
| The standard | Firm, drained and graded enough that, with supporting materials, the equipment manufacturer's specifications for support and level are met. Marshes and wetlands are excepted from the drainage requirement |
|---|---|
| Supporting materials | Blocking, mats, cribbing and similar materials |
| Who provides the ground | The controlling entity, which is the prime or general contractor or another entity with overall responsibility for the project |
| What they must tell you | The location of hazards beneath the setup area that they know about or that are in their documents, such as voids, tanks and utilities |
| No controlling entity | The employer with authority at the site to make or arrange for ground preparations |
| If the ground is not good enough | The A/D director or the operator raises it, and their employer takes it up with the controlling entity |
Source: 29 CFR 1926.1402.
| Extension | Fully extended, or deployed as specified in the load chart where the manufacturer allows it |
|---|---|
| Wheels | Outriggers are set to remove the weight of the equipment from the wheels, except on locomotive cranes |
| Floats | Attached to the outriggers when used |
| Seeing them | Each outrigger or stabilizer must be visible to the operator or to a signal person while it is being extended or set |
| Blocking | Only under the outrigger or stabilizer float or pad of the jack, or under the outer bearing surface of the extended beam |
| Jack holding valve | An integral holding device or check valve on hydraulic outrigger and stabilizer jacks is a required safety device |
| Position sensor | An outrigger or stabilizer position sensor is required on equipment built after November 8, 2011 |
Sources: 29 CFR 1926.1404, 29 CFR 1926.1415 and 29 CFR 1926.1416.
25 questions, no sign-up, every answer explained.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: A. That the beam is at full extension. A visual full-extension mark lets the operator and the crew confirm at a glance that the crane is in the configuration the fully-extended chart assumes, rather than in an unrated intermediate position.
Answer: C. Fully extended or, if manufacturer procedures permit, deployed as specified in the load chart. 1926.1404(q)(1) requires outriggers/stabilizers to be either fully extended or deployed as specified in the load chart when manufacturer procedures permit.
Answer: C. 1 foot. Being within 1% (.57 degrees) of level means the ground cannot rise or drop more than 1 foot in 100 horizontal feet.
Answer: A. They must be secured to the outrigger jacks. Pads or floats must be secured to the outrigger jacks when in use.
Answer: D. About 12 inches. 1% of 100 ft is 1 ft, so the plumbed whip line hangs about a foot off center. It is a good field check in all quadrants, but useless in wind.
Answer: B. When lifting over a corner. Cranes produce the most ground pressure when lifting over the corner, because the load concentrates on one outrigger.
Answer: B. 90 degrees. The outrigger pad must be at a 90-degree angle from the cylinder so the load passes straight through it.
Answer: A. The load on the support divided by its contact area. GBP = force divided by contact area; increasing the pad or mat area lowers the pressure applied to the soil.
Your result
A pad or mat does one thing: it spreads the outrigger load over more ground. The same load on twice the area is half the pressure. That is why the pad has to be big enough for the soil, stiff enough not to bend around the float, and centered under it.
OSHA does not give a pad size. It gives the test: with the supporting material in place, the manufacturer's requirements for support and level have to be met. The crane manufacturer's outrigger loads and the bearing capacity of the ground are the two numbers that decide the pad.
The rule also says where blocking may go: under the float or pad of the jack, or under the outer bearing surface of the extended beam. Part-way along the beam is not on that list.
| Level indicator | A crane level indicator is a required safety device. If it is not working, the crane does not operate |
|---|---|
| Shift inspection | Level position is checked before each shift and after each move and setup. Ground conditions around the equipment are checked for settling and water |
| Hoisting personnel | The equipment must be within 1% of level grade, on footing a qualified person has found firm and stable, with all outriggers extended and locked |
Sources: 29 CFR 1926.1415, 29 CFR 1926.1412 and 29 CFR 1926.1431.
One percent is one foot in a hundred. The rest of the personnel hoisting rules.
FAQ
Guide
Who the A/D director is under OSHA 1926.1404 and what they must do.
Assembly/disassembly directorGuide
A step-by-step method, gross and net capacity, and eight questions.
How to read a crane load chartGuide
OSHA's shift, monthly and annual inspections, item by item.
Crane inspection checklist25 questions. No sign-up. Every answer explained.