A tower crane is built on site, grows with the building and is taken apart piece by piece. OSHA's tower crane section, 1926.1435, is mostly about those three stages. Pre-operations is also the largest domain on the OECP tower crane written.
The short answer
OSHA treats tower crane erecting, climbing and dismantling as assembly and disassembly, under an A/D director. Foundations must be designed by the manufacturer or a registered professional engineer. The tower must be plumb to the manufacturer's tolerance or, where none is given, to 1:500, about one inch in 40 feet. Before a crane climbs inside a structure, an engineer must verify the structure can carry it.
Checked November 2026 against the text of 29 CFR 1926.1435, 29 CFR 1926.1404 and the OECP Crane Operator Candidate Manual.
| Who directs | An A/D director, under the same assembly and disassembly rules as other cranes |
|---|---|
| People below | No one in or under the tower, jib or rotating portion during erecting, climbing or dismantling until the crane is secured in a locked position and the competent person in charge says it is safe |
| Foundations and supports | Designed by the manufacturer or a registered professional engineer |
| What the A/D director must address | Foundations and structural supports, the loss of backward stability, and wind speed |
| Plumb | To the manufacturer's tolerance. Where the manufacturer gives none, at least 1:500, about 1 inch in 40 feet, verified by a qualified person |
| Climbing | Follow the manufacturer's prohibitions. Before climbing within a structure, a registered professional engineer verifies the host structure is strong enough to take the forces |
| Counterweight and ballast | As the manufacturer or a registered professional engineer specifies, and never more than the maximum |
| Several cranes | Fixed jib cranes must be positioned so they cannot contact each other's structures |
Source: 29 CFR 1926.1435, paragraph (b).
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: D. 1:500 (about 1 inch in 40 feet). Cranes should be plumbed to 1:500, roughly 1 inch of lean per 40 feet of height.
Answer: D. Increases. Longer jibs require more counterweight — the counterweight tables step the required mass up with each jib length.
Answer: A. A crane arranged to raise itself from floor to floor within a building as construction advances. An internal climbing tower crane is arranged to raise itself from floor to floor within a structure under construction, using a climbing frame supported by the building.
Answer: B. Climbing operation. Per ASME B30.3: load-bearing members of the climbing and support system are inspected before each climbing operation.
Answer: C. The crane and foundation are tested per the manufacturer's instructions, including setting all motion, zone, and load limits. Post-erection testing follows the manufacturer's instructions and includes setting all motion, zone, and load limits before use.
Answer: A. The vertical moment of the superstructure about the balance point goes to zero. Balance is the superstructure condition necessary for climbing, achieved when the load (or luffing boom) is at the radius that drives the vertical moment about the balance point to zero.
Answer: D. 20 mph. ASME B30.3 3-1.1.5(j): climbing/telescoping is limited to a max wind of 20 mph (unless manufacturer states otherwise).
Answer: C. A bracing frame connecting the mast to the building structure so the crane can climb beyond freestanding height. Tie-ins/collars laterally brace the mast to the structure, allowing mast heights above the freestanding limit.
Your result
25 questions, no sign-up, every answer explained.
A tower crane cannot run with a failed safety device. Operational aids have repair deadlines and temporary measures.
| Kind | Devices |
|---|---|
| Safety devices | Boom stops and jib stops on luffing cranes, travel rail end stops and rail clamps, check valves on load-supporting hydraulic cylinders, a hydraulic pressure limiting device, brakes that set automatically when power or pressure is lost, deadman or forced-neutral controls, an emergency stop at the operator's station, and trolley end stops |
| Category I aids, repaired within 7 days | Trolley travel limiting device, boom hoist limiting device, anti-two-block device, hoist drum lower limiting device, load moment limiting device, hoist line pull limiting device, rail travel limiting device and a boom hoist drum positive locking device |
| Category II aids, repaired within 30 days | Boom angle or hook radius indicator, trolley, boom hoist and load hoist deceleration devices, a wind speed indicator and a load indicating device |
Source: 29 CFR 1926.1435, paragraphs (d) and (e). The hoist drum lower limiting device and load indicating device apply to cranes built after November 8, 2011.
| Before erection | A qualified person inspects the components, especially the parts that are hard to inspect once the crane is up |
|---|---|
| After erection | A load test using certified weights, or weights weighed on a calibrated scale |
| Monthly, in addition to the usual items | Tower or mast bolts and other structural bolts, and the uppermost tie-in, braces, floor supports and floor wedges |
| Annual, in addition to the usual items | All turntable and tower bolts, for condition and torque |
Source: 29 CFR 1926.1435, paragraph (f).
The 2025 candidate manual gives pre-operations about 46% of the tower crane written, more than operations. Erection, climbing, inspection and setup all sit there.
The manual's sample tower crane chart is a Peiner SK 405. OECP tower crane certification covers the hours, the written and the six-part practical. Take the free tower crane practice test.
FAQ
Guide
The 500-hour rule, the written, the six-part practical and practice questions.
OECP tower crane certificationGuide
Who the A/D director is under OSHA 1926.1404 and what they must do.
Assembly/disassembly directorPractice test
Its own written exam, including self-erecting tower cranes.
Tower crane practice test25 questions. No sign-up. Every answer explained.