Tower crane is its own OECP certification, with its own written exam and practical. The entry bar is higher than for mobile cranes, because half of your documented hours have to be on tower cranes.
The short answer
You need 1,000 documented hours in the past five years, 500 of them on tower cranes. The written is 75 questions in two hours. The practical has six tests on a crane with a cab at least 40 feet above the ground, and you need 70 of 100 points. The card lasts five years.
Checked November 2026 against the OECP Crane Operator Candidate Manual (2025 edition), the OECP eligibility page and the NCCCO Foundation directory of accredited certification programs, June 29, 2026.
| Who can apply | IUOE members in good standing |
|---|---|
| Hours | 1,000 documented hours of crane-related experience or training in the past five years, 500 of them on tower cranes |
| Also required | A current DOT or state medical card and a negative drug test dated within 90 days of the application |
| Crane types covered | Tower cranes, including portable and self-erecting types |
| Written exam | 75 multiple-choice questions, two hours, no calculators |
| Written domains | Pre-operations about 46%, operations about 44%, technical about 10% |
| Passing score | 500 on a scale of 200 to 800 |
| Practical | Six tests. Start at 100 points, 70 passes |
| Accreditation | NCCA, through November 30, 2029 |
Sources: OECP Crane Operator Candidate Manual, OECP initial certification eligibility and the NCCCO Foundation directory of accredited certification programs, June 29, 2026.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: C. Controls must be plainly marked to show their function and must move the crane in the direction indicated. Controls must be clearly marked to show function and must move the crane in the marked direction.
Answer: A. Added sail area may impair the ability of the crane to weathervane. Adding signage can affect the ability of the crane to weathervane out of service, so the manufacturer must be consulted before installing any of it.
Answer: D. At operators station and at the base of the crane. ASME B30.3 3-3.4.3-1(f): caution signs at the operator's station and at the base of the crane.
Answer: B. Pendant lines. The jib on saddle-jib and luffing cranes is supported by pendant lines running to the tower top or mast.
Answer: D. Just beneath the jib at the top of the tower. On a fixed-tower crane the tower itself does not turn; the slewing ring sits beneath the jib so only the upper works rotate.
Answer: B. Keep the operators in constant radio contact, with one person organizing the loads and hoisting. For overlapping cranes the two operators should be in constant radio contact, with one person organizing the loads and hoisting so there are no collisions or fouled loads.
Answer: A. Specified by crane manufacturer. ASME B30.3 3-2.2.2: load limit device static test loads are as specified by the crane manufacturer.
Answer: B. 5 minutes. ASME B30.3 3-3.2.2(c): proof test load held for 5 minutes.
Your result
25 questions, no sign-up, every answer explained.
The manual requires a crane with an operating cab at least 40 feet above the ground.
| Test | Time limit |
|---|---|
| Pre-operational check | 2 minutes |
| Hand signals | At least four ASME B30.3 signals |
| Start and stop circle, at a 50-foot hook height | 3.5 minutes |
| S-shaped corridor, forward and reverse | 3.5 minutes each way |
| S-shaped corridor, start circle to start circle | 2.75 minutes |
| Shutdown | 2 minutes |
Source: OECP Crane Operator Candidate Manual, tower crane practical examination.
Pre-operations is the biggest domain, at about 46% of the questions. That points at erection, climbing and inspection, not just running the crane. Start here:
Then test yourself. Take the free 20-question tower crane practice test.
FAQ
Guide
Every test on the mobile, tower and overhead practicals, with time limits.
OECP practical examGuide
OSHA 1926.1435: foundations, plumb, climbing, devices and inspections.
Tower crane erecting and climbingPractice test
Its own written exam, including self-erecting tower cranes.