Guide
Lift director
What a lift director does under ASME B30.5 and OSHA, with questions.
Lift directorOSHA 1926.1404
Putting a crane together and taking it apart is where a lot of crane accidents happen. OSHA puts one person in charge of it and spells out what that person has to do.
The short answer
Under 29 CFR 1926.1404, crane assembly and disassembly must be directed by a person who is both a competent person and a qualified person, or by a competent person assisted by qualified persons. OSHA calls this the A/D director, whatever the job title. The A/D director must understand the procedures and review them with the crew before work starts.
Checked November 2026 against the text of 29 CFR 1926.1404, 29 CFR 1926.1401 and 29 CFR 1926.1435.
| Who qualifies | A person who meets the criteria for both a competent person and a qualified person, or a competent person who is assisted by one or more qualified persons |
|---|---|
| Know the procedure | The A/D director must understand the assembly and disassembly procedures that apply |
| Brief the crew | Before work starts, make sure the crew understands their tasks, the hazards of those tasks, and the positions and locations to stay out of |
| Brief again | When a task changes or a new person joins the crew |
| Crew out of view | Before a crew member goes somewhere the operator cannot see and where equipment movement could injure them, the operator must be told |
| Rigging | Rigging work during assembly and disassembly must be done by a qualified rigger |
| Synthetic slings | Protected from abrasive, sharp or acute edges and used as the sling manufacturer instructs |
Source: 29 CFR 1926.1404. Definitions are in 29 CFR 1926.1401.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: A. Adequate illumination of the work area, hazards, staging, and signal locations. Monitoring site conditions during execution includes providing adequate lighting so hazards, crew positions, and signals remain visible.
Answer: A. Supported, blocked, or secured so it cannot move unintentionally when the pins are pulled. 1926.1404(h)(7) requires that component stability upon pin removal be addressed so components are blocked/secured/supported against unintended dangerous movement.
Answer: D. If the A/D director or a crew member identifies an unsafe condition, work must stop until the hazard is corrected. The A/D director must address unsafe conditions; recognized hazards require stopping work until corrected, and crew members can and should raise safety concerns.
Answer: C. The boom-hoist brake is functional (or another means is used) so the boom cannot free-fall. 1926.1404(h)(10): each time the boom hoist brake will be relied on to hold the boom during A/D, it must first be tested to confirm it can prevent boom movement; if it cannot, a boom hoist pawl, other locking/back-up braking device, blocking, or an assist crane must be used so the boom cannot fall.
Answer: A. To protect the sheave guards from being crushed. Resting the tip directly on the ground can bend or crush the sheave guards and damage the sheaves. Blocking holds the tip clear while sections are pinned.
Answer: B. A qualified signal person relays signals, or operations that could endanger the crew member are suspended until they return to view. 1926.1404(e) requires protecting out-of-view crew via signals/notification and suspending endangering operations until they are back in view or have informed the director.
Answer: A. The assembled configuration matches a rated configuration in the manufacturer's load chart. The crane must be assembled to a configuration listed in the manufacturer's load charts so rated capacities apply; verifying this is part of confirming safe assembly.
Answer: B. Keep the crane and its outrigger/crawler loads outside the excavation's zone of influence so the ground cannot fail beneath the supports. Setup loads placed within an excavation's angle of repose can cause ground failure; the A/D director must assess site and ground bearing conditions per 1926.1404(h)(1).
Your result
25 questions, no sign-up, every answer explained.
| Extension | Fully extended, or deployed as the load chart specifies |
|---|---|
| Wheels | Outriggers are set to take the weight of the equipment off the wheels, except on locomotive cranes |
| Floats | Attached to the outriggers when used |
| Visibility | Each outrigger or stabilizer is visible to the operator or to a signal person while it is extended or set |
| Blocking | Placed only under the outrigger or stabilizer float or pad, or under the outer bearing surface of the extended beam |
Source: 29 CFR 1926.1404, paragraph (q).
For tower cranes OSHA uses the words erecting, climbing and dismantling, and applies the same rules. Under 1926.1435 the A/D director must also address the foundation and structural supports, backward stability and wind speed. Tower crane erecting, climbing and dismantling.
For derricks, 1926.1436 puts the A/D director in charge of jumping the derrick.
OSHA's rule does not ask for a card. It asks for a person who meets its definitions of competent and qualified. A competent person can identify existing and predictable hazards and has the authority to correct them promptly. A qualified person has a recognized degree, certificate or professional standing, or extensive knowledge, training and experience, and has shown the ability to solve the problems involved.
The employer decides who meets that. Training and testing are a common way to show it. The questions above come from an A/D director question set in the Crane Exam Prep bank.
FAQ
Guide
What a lift director does under ASME B30.5 and OSHA, with questions.
Lift directorGuide
OSHA's rules for ground conditions, outriggers, floats and blocking.
Crane outrigger pads and setupGuide
The construction crane rule, section by section, with the numbers to know.
OSHA 1926 Subpart CC25 questions. No sign-up. Every answer explained.