Guide
ASME B30.5
The mobile crane standard: scope, chapters, jobsite roles and questions.
ASME B30.5Jobsite roles
Every crane lift has someone directing it, whether or not they carry the title. ASME B30.5 names the role, and OSHA requires it by name for lifts with more than one crane.
The short answer
The lift director directly oversees the work being done by the crane and the rigging crew. Under ASME B30.5 the site supervisor designates a qualified person as lift director. OSHA uses the term in 29 CFR 1926.1432: a multiple-crane lift must be directed by a person who is both competent and qualified, who reviews the lift plan with everyone involved.
Checked November 2026 against the text of 29 CFR 1926.1432, 29 CFR 1926.1419 and an NCCCO article on jobsite responsibilities under ASME B30.5.
ASME B30.5 splits responsibility for a mobile crane lift among five roles. The summary follows NCCCO's published explanation of the standard.
| Role | In short |
|---|---|
| Crane owner | Has custody of the crane. Provides a crane that meets the standard and the information that goes with it |
| Crane user | Arranges for the crane to be on site and controls its use. Uses qualified supervisors and operators |
| Site supervisor | Has supervisory control of the site and the crane work. Prepares the crane area and designates the lift director |
| Lift director | Directly oversees the lift and the rigging crew, and carries out the plan |
| Crane operator | Runs the crane |
Source: NCCCO article on jobsite responsibilities under ASME B30.5.
On a small job, one person often holds two roles. The site supervisor and lift director can be the same person.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: D. Lift Director. Para 5-3.1.3(d) defines the lift director as directly overseeing the work being performed by a crane and the associated rigging crew; the site supervisor exercises supervisory control over the worksite.
Answer: B. The operator's verification that the weight does not exceed the crane's rated capacity. The lift director informs the operator of load weights and locations and obtains verification that the weight does not exceed rated capacity.
Answer: C. Be positioned to effectively gauge clearance, be dedicated solely to that task, and be in continuous contact with the operator. Per 1926.1408, the dedicated spotter must be able to gauge clearance accurately, be equipped to signal, work only on that task, and stay in continuous contact with the operator.
Answer: C. Certified or licensed for the type/capacity of equipment and evaluated by the employer for that equipment. 1926.1427 requires operators to be certified or licensed (by type, or type and capacity) and, under 1926.1427(f), evaluated by the employer as able to safely operate the specific equipment before operating it.
Answer: A. Each shift/day the sling is used, by a designated person. B30.9 requires a frequent (each-shift/daily) visual inspection by the user/designated person, in addition to a documented periodic inspection.
Answer: B. 980 lb. Volume = 4 x 6 x (1/12 ft) = 2.0 ft^3; 2.0 x 490 = 980 lb.
Answer: C. The weakest part of the rigging. The rigging system's capacity is set by its lowest-rated component, so that is the number that has to be documented and checked against the load. The same form also records maximum allowable wind speed and approvals for lifting over pipe racks, process equipment, or electrical lines.
Answer: B. Selecting, inspecting, and attaching the rigging and attaching tag lines to control the load. The rigger selects and inspects slings/hardware, attaches the rigging to the load, and rigs tag lines used to control the suspended load.
Your result
25 questions, no sign-up, every answer explained.
| Plan | Required before any lift that uses more than one crane or derrick |
|---|---|
| Who writes it | A qualified person |
| Engineering | The employer must provide engineering expertise if the qualified person decides it is needed |
| Who directs the lift | A lift director who meets the criteria for both a competent person and a qualified person, or a competent person assisted by qualified persons |
| Meeting | The lift director reviews the plan in a meeting with all the workers who will be involved |
Source: 29 CFR 1926.1432.
The lift director also appears in OSHA's signal rules. Under 1926.1419, a non-standard hand signal can be used only if the signal person, the operator and the lift director agree on it before the lift.
The questions on this page are a fair sample. A lift director works across the whole lift:
Neither OSHA nor the role description above requires a certification card. OSHA's test is whether the person is competent and qualified as the rule defines those words.
OECP does not list a lift director certification among its programs. Its certifications are for crane operators and for signal person riggers. CCO offers a lift director certification. OECP and NCCCO compared.
FAQ
Guide
The mobile crane standard: scope, chapters, jobsite roles and questions.
ASME B30.5Guide
Who the A/D director is under OSHA 1926.1404 and what they must do.
Assembly/disassembly directorGuide
What OSHA requires: training, certification or a license, and evaluation.
Crane operator requirements25 questions. No sign-up. Every answer explained.