Guide
OSHA 1926 Subpart CC
The construction crane rule, section by section, with the numbers to know.
OSHA 1926 Subpart CCPower lines
Power line contact is the hazard OSHA's crane rule spends the most words on. The rule starts from one question: could any part of the crane or load get within 20 feet of the line?
The short answer
If any part of the crane, load line or load could get closer than 20 feet to a power line, the employer must deenergize and ground the line, keep 20 feet away, or find the voltage and use Table A. Table A is 10 feet for lines up to 50 kV, 15 feet up to 200 kV and 20 feet up to 350 kV. Treat every line as energized until the utility confirms otherwise.
Checked November 2026 against the text of 29 CFR 1926.1408, 29 CFR 1926.1409 and 29 CFR 1926.1411.
These are the distances to keep during operations when you know the line's voltage.
| Voltage, nominal kV, alternating current | Minimum clearance |
|---|---|
| Up to 50 | 10 feet |
| Over 50 to 200 | 15 feet |
| Over 200 to 350 | 20 feet |
| Over 350 to 500 | 25 feet |
| Over 500 to 750 | 35 feet |
| Over 750 to 1,000 | 45 feet |
| Over 1,000 | Set by the utility owner or operator, or by a registered professional engineer who is qualified in power transmission and distribution |
Source: 29 CFR 1926.1408, Table A.
Before work starts, the employer marks out the work zone and decides whether any part of the equipment, load line or load could get closer than 20 feet to a power line at the crane's maximum working radius. If it could, one of three options applies.
For lines over 350 kV, 1926.1409 replaces every 20 feet in this rule with 50 feet.
25 questions, no sign-up, every answer explained.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: A. Provide the equipment with an electrical ground and use nonconductive tag lines. Near transmitter towers, either the transmitter is deenergized or the equipment is grounded and any tag lines used are nonconductive.
Answer: A. Stay on the crane, warn others to stay away, and try to move the crane clear of the contact. The operator should remain on the crane and attempt to break contact; leaving the machine risks step potential, and jumping clear with feet together is a last resort only if fire forces evacuation.
Answer: D. 10 feet. For lines 50 kV or below the minimum clearance is 10 ft (3 m); higher voltages require more per the table.
Answer: C. The utility owner/operator or a registered professional engineer qualified in power transmission. Table A tops out at 1,000 kV; beyond that, the utility owner/operator or a qualified registered professional engineer must set the distance.
Answer: D. Energized until the power company has verified it is not energized. ASME B30.3 3-3.4.3(d): treat all lines as energized until the owner verifies otherwise.
Answer: D. Jump clear without touching the machine and ground simultaneously, then shuffle/hop away with feet together. To avoid becoming a path to ground, jump clear so as never to contact machine and ground at once, land with feet together, and shuffle/hop away to avoid step potential.
Answer: A. Immediately available on site. Power-line safety procedures must be documented and immediately available on-site.
Answer: A. 20 feet. If any part of traveling equipment will come within 20 feet of a power line, a dedicated spotter in continuous contact with the driver/operator must be used.
Your result
Choosing Option 2 or 3 brings a set of required steps under 1926.1408(b):
Plus at least one of these:
A dedicated spotter has one job. OSHA defines the role as someone who meets the signal person qualifications and whose sole responsibility is to watch the separation between the line and the equipment, load line and load.
A crane moving with no load and its boom lowered follows a different table.
| Voltage, nominal kV | Minimum clearance while travelling |
|---|---|
| Up to 0.75 | 4 feet |
| Over 0.75 to 50 | 6 feet |
| Over 50 to 345 | 10 feet |
| Over 345 to 750 | 16 feet |
| Over 750 to 1,000 | 20 feet |
| Over 1,000 | Set by the utility owner or operator, or a registered professional engineer |
Source: 29 CFR 1926.1411, Table T.
FAQ
Guide
The construction crane rule, section by section, with the numbers to know.
OSHA 1926 Subpart CCGuide
All 19 standard signals from OSHA Appendix A, and the rules for using them.
Crane hand signalsGuide
OSHA 1926.1431: the 50% rule, trial lifts, proof tests and wind.
Crane man basket rules25 questions. No sign-up. Every answer explained.