Guide
OSHA 1910.179
The overhead and gantry crane rule: clearances, brakes, inspections and loads.
OSHA 1910.179OECP overhead crane
OECP certifies overhead crane operators separately from mobile and tower crane operators. The written leans heavily on operations, and on the general industry rules for overhead cranes.
The short answer
You need IUOE membership in good standing, 1,000 documented hours in the past five years, a current medical card and a negative drug test. The written is 75 questions in two hours, with operations about 53% of it. The practical starts at 100 points and 70 passes.
Checked November 2026 against the OECP Crane Operator Candidate Manual (2025 edition), the OECP eligibility page and the NCCCO Foundation directory of accredited certification programs, June 29, 2026.
| Who can apply | IUOE members in good standing |
|---|---|
| Hours | 1,000 documented hours of crane-related experience or training in the past five years |
| Also required | A current DOT or state medical card and a negative drug test dated within 90 days of the application |
| Written exam | 75 multiple-choice questions, two hours, no calculators |
| Written domains | Standards about 15%, pre-operations about 32%, operations about 53% |
| Passing score | 500 on a scale of 200 to 800 |
| Practical | Function checks, hand signals, a start and stop circle, an S-shaped corridor forward and in reverse, a return to the start circle and shutdown |
| Practical score | Start at 100 points, 70 passes |
| Accreditation | NCCA, through November 30, 2029 |
Sources: OECP Crane Operator Candidate Manual, OECP initial certification eligibility and the NCCCO Foundation directory of accredited certification programs, June 29, 2026.
Pick an answer to see whether you are right and why. These are original practice questions from the Crane Exam Prep question bank, not actual exam questions.
Answer: D. The weight of a 200 lb. person. Each guard must support a 200 lb. person without permanent deformation, unless located where it is not probable a person will step on it.
Answer: B. Place all controllers in the off position and verify no worker is on or adjacent to the crane. Before closing the main line disconnect, the operator shall place all controllers in the off position and verify that no worker is on or adjacent to the crane.
Answer: D. Lifting and lowering, trolley travel, bridge travel, hoist limit devices, and travel-limiting devices if provided. Operational tests include lifting and lowering, trolley travel, bridge travel, hoist limit devices (switches), and bridge/trolley travel-limiting devices if provided, plus locking devices and wind speed indicators.
Answer: C. bridge and trolley controller. A swinging load is countered with the horizontal travel motions: moving the bridge and trolley to follow (or lead) the swing brings the crane back over the load's center of gravity and dampens the swing.
Answer: C. 10% of rated load speed in ft/min when traveling at rated speed with rated load. The trolley braking means shall stop travel within a distance in feet equal to 10% of rated load speed in ft/min when traveling at rated speed with rated load, and impede motion against a force equal to 1% of the combined weight of trolley, hoist, and rated load when parked.
Answer: D. Momentarily stop the controllers in the OFF position before reversing, except to avoid accidents. Without plugging protection, always pause momentarily in OFF before reversing — the slight pause gives the braking mechanism time to operate — except when reversing immediately to avoid an accident.
Answer: C. Frequent inspection requirements (para. 2-2.1.4). A crane idle 1 month or more but less than 1 year shall receive a frequent-type inspection; a crane idle 1 year or more shall receive a periodic-type inspection before being placed in service.
Answer: B. Their weight is considered part of the rated load. The weight of non-reeved lifting devices (buckets, magnets, grabs and similar supplemental units) is considered part of the rated load, reducing the payload the crane may lift.
Your result
25 questions, no sign-up, every answer explained.
The manual's reference list for the crane exams includes OSHA 1910.179 and ASME B30.2, the two documents written for overhead and gantry cranes. Work through these:
Operations is more than half the exam, so finish with timed practice. Take the free 20-question overhead crane practice test.
OSHA's certification rule, 29 CFR 1926.1427, is part of the construction crane standard. Under 1926.1438, an overhead or gantry crane permanently installed in a facility is covered by 1910.179 instead, and that rule says only that designated personnel may operate the crane.
So a certification card is often an employer or project requirement, not a federal one, for permanently installed overhead cranes. Ask your employer or training site which applies to your work. More on what OSHA requires.
FAQ
Guide
The overhead and gantry crane rule: clearances, brakes, inspections and loads.
OSHA 1910.179Guide
Frequent and periodic inspections under OSHA 1910.179, with questions.
Overhead crane inspectionPractice test
Its own written exam for overhead crane operators.
Overhead crane practice test25 questions. No sign-up. Every answer explained.